BINA Industrial Flooring Expert Projects
Bina Integrated Technology Sdn. Bhd. • CIDB Grade G4 (PPK: 1970218-WP023002)

Completed Projects & Site Inspection Reports (BIT Floor+™)

Comprehensive technical documentation of high-performance polymer resin and concrete slab installations executed by BINA Industrial Flooring Expert. Engineered to satisfy stringent HALAL, ISO, GMP, and HACCP compliance audits with a verified minimum-downtime execution protocol.

500+ Completed Projects
149,200+ m² Installed Floor Area
34+ Years Established Since 1991
0 Delamination Incidents
Statutory Compliance & Standards

Accredited CIDB Grade G4 Civil Engineering & Certified Formulations

Every installation strictly complies with Malaysian statutory standards, international mechanical test protocols (ASTM & EN), and food hygiene regulations.

CIDB Malaysia certification logo CIDB Malaysia
SIRIM QAS certification logo SIRIM QAS
JKR Malaysia certification logo JKR Malaysia
ISO 9001:2015 certification logo ISO 9001:2015
HACCP International certification logo HACCP International
MyHIJAU Mark certification logo MyHIJAU Mark
IEC 61340 certification logo IEC 61340
Institutional Trust & Corporate Roster

Trusted by Government Statutory Bodies, Corporate Leaders & Universities

A representative portfolio of institutional clients served by Bina Integrated Technology Sdn. Bhd. across civil infrastructure and building protection since 1991.

Jabatan Kerja Raya (JKR)
Tenaga Nasional Berhad (TNB)
Maybank Berhad
RHB Bank
KWSP / EPF
PNB Commercial
Universiti Kebangsaan Malaysia (UKM)
Universiti Teknologi MARA (UiTM)
TIME dotCom
500+ Civil Deliveries
i
Commercial Non-Disclosure Agreement (NDA) Compliance: In accordance with strict commercial confidentiality agreements with multinational manufacturing clients (semiconductor fabrication plants, medical cleanrooms, biopharma halls, and automotive OEMs), corporate client trade names are withheld from public disclosure. Technical engineering specifications, floor plate areas (m²), diagnostic test standards (ASTM / IEC / BS / HACCP), and industrial corridor locations represent genuine civil installations executed under the BIT Floor+™ protocol by Bina Integrated Technology Sdn. Bhd.
Verified Civil Delivery • CIDB Grade G4 • BIT Floor+™

Case Studies & Comprehensive Handover Reports

Explore detailed civil inspection reports, substrate moisture readings, and before-and-after surface transformations delivered across Malaysia without disrupting ongoing manufacturing operations.

150,000+ m² Installed Floor Area
0 Delamination Incidents
34+ Years Civil Engineering Heritage
CIDB G4 Licensed Civil Contractor
Semiconductor Cleanroom ESD Conductive Flooring - Real Jobsite Installation
ESD Conductive
Completed 2024
Live Site Handover
Batu Kawan Industrial Park, Penang • Semiconductor & Advanced Microelectronics
BIT Floor+™ ESD Conductive Matrix Client Identity Protected under Commercial NDA

Semiconductor Cleanroom ESD Conductive Flooring

System & Thickness Anti-Static Conductive Epoxy Flooring (2.5mm)
Floor Area 14,500 m² (156,076 sqft)
Tested Standards: IEC 61340-5-1 • ANSI/ESD S20.20 • ASTM F150
Engineering Challenge: Multinational facility required sub-10-volt human body voltage generation across automated guided vehicle (AGV) aisles without releasing airborne particulate into adjacent active ISO Class 5 cleanroom bays.
BINA Civil Solution: Deployed dust-free captive centrifugal steel shot blasting under continuous negative pressure HEPA containment. Embedded an orthogonal electrolytic copper grid and applied solvent-free conductive carbon-matrix epoxy under the BIT Floor+™ minimum-downtime protocol.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Bare concrete slab exhibiting micro-fissures and 88.5% relative humidity vapor drive.
Moisture Vapor Drive: 88.5% RH (ASTM F2170 in-situ probe) — Required ASTM F3010 epoxy vapor barrier primer.
Mechanical Surface Profile: ICRI CSP 3 via dust-free captive steel shot blasting; 100% surface laitance removed.
Hydraulic Adhesion Pull-Off: 2.42 MPa (ASTM D4541 hydraulic tester) — Exceeds 1.5 MPa industrial benchmark.
Specific Mechanical / Electrical Test: Point-to-Ground: 3.8 x 10^5 Ω (Megohmmeter 100V test conforming to IEC 61340-4-1).
QA Sign-Off: Signed off by Senior Civil Resident Engineer; Official CIDB Grade G4 Handover Handed Over.
Execution Turnaround: 28 Days
Request Project Specs
Central Cold Chain & Food Processing Heavy-Duty PU Screed - Real Jobsite Installation
PU Screed
Completed 2024
Live Site Handover
Seksyen 15 Industrial Zone, Shah Alam, Selangor • Food & Beverage Processing / Cold Storage
BIT Floor+™ Thermal Shock Polyurethane Client Identity Protected under Commercial NDA

Central Cold Chain & Food Processing Heavy-Duty PU Screed

System & Thickness Heavy-Duty Polyurethane Concrete Screed (6.0mm)
Floor Area 8,200 m² (88,264 sqft)
Tested Standards: HACCP Certified • BS 8204-6 Type 8 • EN 13813
Engineering Challenge: Previous epoxy coating delaminated under extreme thermal cycling between boiling 95°C CIP sanitization discharge and continuous -25°C blast-chiller refrigeration rooms.
BINA Civil Solution: Chased 8x8mm load-relief perimeter anchor grooves along all wall junctions and drains. Applied heavy-duty water-dispersed polyurethane cement screed with matching thermal expansion coefficients to the concrete slab.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Severe delamination of failed previous coating, deep chemical lactic acid erosion around floor drains.
Moisture Vapor Drive: Saturated sub-slab slab condition — Tolerant to 100% moisture via waterborne PU cement chemistry.
Mechanical Surface Profile: ICRI CSP 4-5 via mechanical scarification and diamond surface profiling.
Hydraulic Adhesion Pull-Off: 2.25 MPa (ASTM D4541) — Substrate concrete cohesion failure without delamination.
Specific Mechanical / Electrical Test: Non-conductive hygienic matrix with integrated anti-microbial agent (ISO 22196).
QA Sign-Off: HACCP and Halal compliance audit passed 100% on first inspection; 10-year warranty registered.
Execution Turnaround: 18 Days
Request Project Specs
Automotive Stamping & Powertrain Assembly Epoxy Flooring Mortar - Real Jobsite Installation
Industrial Epoxy Flooring
Completed 2023
Live Site Handover
Bukit Raja Industrial Park, Klang, Selangor • Automotive & Heavy Metal Manufacturing
BIT Floor+™ High-Impact Epoxy Flooring Mortar Client Identity Protected under Commercial NDA

Automotive Stamping & Powertrain Assembly Epoxy Flooring Mortar

System & Thickness High-Impact 100% Solids Epoxy Mortar Screed (4.0mm)
Floor Area 18,000 m² (193,750 sqft)
Tested Standards: ASTM D4541 • ASTM D4060 • JKR Civil Specification 14
Engineering Challenge: Unprotected concrete slab suffered massive mechanical spalling from dropped steel stamping dies, dragging of heavy steel stillages, and constant oil seepage from hydraulic press pits.
BINA Civil Solution: High-pressure polyurethane crack injection (250 bar) to stabilize moving slab fractures, captive shot blasting to CSP 4, and installation of silica-reinforced 100% solids epoxy mortar capped with an aliphatic polyurethane topcoat.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Deep gouging, oil-saturated expansion joints, broken joint arrises in forklift main arteries.
Moisture Vapor Drive: 78% RH (ASTM F2170) — Degreased with industrial emulsifiers followed by mechanical scarification.
Mechanical Surface Profile: ICRI CSP 4 achieved via double-pass captive steel shot blasting.
Hydraulic Adhesion Pull-Off: 2.55 MPa (ASTM D4541) — Complete concrete substrate fracture mode.
Specific Mechanical / Electrical Test: Abrasion Loss: < 35 mg (Taber Abraser CS-17, 1000 cycles, 1 kg load conforming to ASTM D4060).
QA Sign-Off: Signed off by Plant Engineering Lead; Zero downtime delivered via phased weekend execution.
Execution Turnaround: 35 Days
Request Project Specs
High-Bay Automated Logistics Distribution Center - Real Jobsite Installation
Polished Concrete
Completed 2023
Live Site Handover
PKFZ Free Commercial Zone, Port Klang, Selangor • High-Bay Automated Warehousing & Logistics Hub
BIT Floor+™ Crystalline Lithium Densifier Client Identity Protected under Commercial NDA

High-Bay Automated Logistics Distribution Center

System & Thickness Lithium Densified Polished Concrete & Liquid Hardener
Floor Area 26,000 m² (279,861 sqft)
Tested Standards: BS 8204-6 Class AR0.5 &bull; ASTM C779 &bull; DIN 18560
Engineering Challenge: High-volume reach trucks and robotic shuttles caused continuous chalky dusting that contaminated automated barcode optical scanners and damaged sensitive electric drive bearings.
BINA Civil Solution: Multi-stage planetary diamond grinding up to 800-grit, deep saturation with reactive nano-lithium silicate densifier to convert free calcium hydroxide into permanent calcium silicate hydrate (C-S-H), followed by high-speed thermal burnishing.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Chalking laitance surface, uneven pour ridges along racking aisles causing reach truck mast vibration.
Moisture Vapor Drive: Standard ambient slab — Diamond grinding process performed 100% dry with OSHA-compliant HEPA dust extractors.
Mechanical Surface Profile: Planetary diamond honed through 50, 100, 200, 400, and 800-grit resin bond diamonds.
Hydraulic Adhesion Pull-Off: Surface Hardness increased to Mohs 7-8; Concrete abrasion resistance boosted by 420%.
Specific Mechanical / Electrical Test: Specular Gloss: 62 GU average across 26,000 m² floor plate (ASTM D523).
QA Sign-Off: Logistics hub passed automated vehicle laser guidance tests; Lifetime anti-dusting warranty registered.
Execution Turnaround: 24 Days
Request Project Specs
Medical Device Cleanroom Packaging Hall - Real Jobsite Installation
Industrial Epoxy Flooring
Completed 2024
Live Site Handover
Senai Airport City, Senai, Johor • Medical Device Manufacturing & Packaging
BIT Floor+™ Anti-Microbial Cleanroom Matrix Client Identity Protected under Commercial NDA

Medical Device Cleanroom Packaging Hall

System & Thickness Seamless Self-Leveling Epoxy Flooring (3.0mm)
Floor Area 9,500 m² (102,257 sqft)
Tested Standards: ISO 14644-1 Class 7 &bull; SIRIM Eco-Label 025:2020 &bull; ASTM D4541
Engineering Challenge: Cleanroom audit required zero bacterial harbourage seams, non-outgassing resin formulation to protect delicate optical biosensors, and 100mm radius coved wall junctions.
BINA Civil Solution: Installed zero-VOC epoxy primer, cast 3.0mm self-leveling aliphatic polyurethane-epoxy hybrid body with silver-ion antimicrobial additive, and executed seamless 100mm pencil radius coving flush with wall sandwich panels.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: New power-floated concrete slab with curing membrane residues requiring laitance removal.
Moisture Vapor Drive: 82% RH (ASTM F2170) — Primed with moisture-tolerant 100% solids epoxy penetrating primer.
Mechanical Surface Profile: ICRI CSP 2 via fine diamond grinding with continuous HEPA filtration.
Hydraulic Adhesion Pull-Off: 2.15 MPa (ASTM D4541) — Complete parent concrete cohesive failure.
Specific Mechanical / Electrical Test: ISO 14644-1 Class 7 particulate emission certified (zero flaking/zero dusting).
QA Sign-Off: Cleanroom validation signed off by International QA Auditor; Handover completed on schedule.
Execution Turnaround: 20 Days
Request Project Specs
Optoelectronics & Micro-Assembly ESD Facility - Real Jobsite Installation
ESD Conductive
Completed 2023
Live Site Handover
Kulim Hi-Tech Park (KHTP), Kedah • High-Tech Optical Transceivers & Sensor Assembly
BIT Floor+™ Static Dissipative Matrix Client Identity Protected under Commercial NDA

Optoelectronics & Micro-Assembly ESD Facility

System & Thickness Static Dissipative Conductive Epoxy System (2.0mm)
Floor Area 6,400 m² (68,889 sqft)
Tested Standards: IEC 61340-4-1 &bull; ANSI/ESD S20.20 &bull; ASTM F2170
Engineering Challenge: Ultra-sensitive optical semiconductor transceiver testing required rapid static discharge without hazardous spark jump, coupled with high durability against rolling chair casters and isopropyl alcohol wipes.
BINA Civil Solution: Laid perimeter and cross-grid copper grounding tapes linked to facility main earth bars, applied conductive black primer layer, and finished with a calibrated dissipative colored epoxy topping.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Sound Grade 30 concrete with localized shrinkage hairline cracking along construction bays.
Moisture Vapor Drive: 81% RH — Sealed with solvent-free moisture mitigation epoxy primer.
Mechanical Surface Profile: ICRI CSP 3 achieved via enclosed planetary diamond grinding.
Hydraulic Adhesion Pull-Off: 2.35 MPa (ASTM D4541) — Exceeds ANSI standard.
Specific Mechanical / Electrical Test: Point-to-Point Resistance: 4.5 x 10^7 Ω; Charge decay time: 0.038 seconds.
QA Sign-Off: ANSI/ESD S20.20 compliance test approved by Lead Facility ESD Coordinator; 5-year warranty registered.
Execution Turnaround: 16 Days
Request Project Specs
Aviation MRO Hangar Skydrol-Resistant Flooring - Real Jobsite Installation
Industrial Epoxy Flooring
Completed 2023
Live Site Handover
Subang Skypark Industrial Zone, Selangor • Commercial Aviation MRO & Avionics Hangar
BIT Floor+™ Aerospace Chemical Defense Client Identity Protected under Commercial NDA

Aviation MRO Hangar Skydrol-Resistant Flooring

System & Thickness High-Performance Epoxy & Aliphatic Polyurethane System (3.5mm)
Floor Area 11,200 m² (120,555 sqft)
Tested Standards: FAA / CAAM Airfield Facility Standards &bull; ASTM D1308 (Skydrol) &bull; MIL-PRF-24613
Engineering Challenge: Aggressive phosphate-ester hydraulic fluids (Skydrol LD-4) dissolve standard epoxies within 48 hours; hangar also required minimum 85% light reflectance to illuminate aircraft undercarriages.
BINA Civil Solution: Specified a dense cross-linked novolac epoxy intermediate layer topped with a high-solids fluoropolymer-modified aliphatic polyurethane finish engineered specifically for commercial aerospace hangars.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Massive 11,200 m² airfield slab with joint expansion movements and previous fuel staining.
Moisture Vapor Drive: 84% RH (ASTM F2170) — Substrate thoroughly degreased and shot-blasted to CSP 4.
Mechanical Surface Profile: ICRI CSP 4 profile achieved via enclosed double-track shot blasting.
Hydraulic Adhesion Pull-Off: 2.60 MPa (ASTM D4541) — Complete parent concrete cohesive failure.
Specific Mechanical / Electrical Test: Skydrol Immersion Spot Test: 7 days continuous exposure with zero softening or gloss loss.
QA Sign-Off: CAAM and MRO safety standards signed off by Chief Aviation Ground Engineer; 10-year warranty granted.
Execution Turnaround: 26 Days
Request Project Specs
GMP Sterile Pharmaceutical Packaging Plant - Real Jobsite Installation
PU Screed
Completed 2024
Live Site Handover
Bandar Baru Bangi Industrial Estate, Selangor • Pharmaceutical Solid Dosage & Sterile Packaging
BIT Floor+™ Cleanline Coved Screed Client Identity Protected under Commercial NDA

GMP Sterile Pharmaceutical Packaging Plant

System & Thickness Heavy-Duty Seamless Polyurethane Screed (4.0mm)
Floor Area 5,400 m² (58,125 sqft)
Tested Standards: NPRA GMP Malaysia &bull; SIRIM Eco-Label 025:2020 &bull; ISO 14644-1
Engineering Challenge: National Pharmaceutical Regulatory Agency (NPRA) GMP compliance required seamless hygienic floor-to-wall junctions with zero volatile emissions during live cleanroom audits.
BINA Civil Solution: Installed waterborne polyurethane concrete resin screed with pre-formed coved bases and solvent-free hygienic sealing layers under the BIT Floor+™ protocol.
Visual Site Transformation (Before & After)
Substrate Before Treatment Before: Damaged Slab
Substrate After Treatment After: BIT Floor+™
Site Technical Inspection & QA Handover Report
Substrate Audit: Aged concrete with previous acid etching scars and hollow sounding near partition lines.
Moisture Vapor Drive: 90.2% RH — Handled effortlessly by breathable polyurethane cement chemistry.
Mechanical Surface Profile: Captive shot blasted to ICRI CSP 4 with 100mm anchor grooves chased at boundaries.
Hydraulic Adhesion Pull-Off: 2.40 MPa (ASTM D4541) — 100% concrete substrate failure.
Specific Mechanical / Electrical Test: Antimicrobial efficacy tested: > 99.9% reduction in bacterial colony growth (JIS Z 2801 / ISO 22196).
QA Sign-Off: NPRA GMP cleanroom validation audit approved on initial submission; 10-year warranty registered.
Execution Turnaround: 14 Days
Request Project Specs

All civil flooring projects are supervised and signed off by certified civil resident engineers of Bina Integrated Technology Sdn. Bhd. (CIDB Grade G4, PPK: 1970218-WP023002).
Direct engineering inquiries can be directed to our senior technical desk.

BIT Floor+™ Engineering Advantages

Audit-Driven Solutions Engineered for Zero Operational Disruption

Every industrial facility requires meticulous staging so that substrate profiling and resin curing do not compromise ongoing assembly lines or warehouse dispatch schedules.

01

Audit-Ready (HALAL / HACCP / GMP / ISO)

Seamless pencil radius coving (100mm) and chemical-resistant toppings eliminate micro-bacterial traps, meeting stringent regulatory audits on initial inspection.

Target Sectors: Food & Beverage, Pharmaceuticals, Blast Freezers.
02

Minimum Downtime Phased Execution

Fast-cure resin formulations and sectional containment allow weekend or overnight installation, ensuring active production lines and AGV routes continue unhindered.

Target Sectors: High-Bay Logistics, Electronics, Automotive Plants.
03

Licensed CIDB Grade G4 Heritage

Backed by our in-house Bangi materials testing laboratory, captive shot blasting fleets, and comprehensive written warranties of up to 10 years.

Warranty: CIDB PPK 1970218-WP023002 • Official BINA Warranty.
Site Audit & Technical Consultation

Require a Custom Specification & Proposal for Your Facility?

BINA Integrated Technology engineers are available to conduct on-site slab relative humidity tests (ASTM F2170), hydraulic adhesion pull-off diagnostics (ASTM D4541), and ICRI CSP profile audits prior to submitting technical proposals.

Direct WhatsApp Technical Helpdesk

Request a Free Industrial Flooring Inspection & Quote

Our senior engineering team provides complimentary on-site slab diagnostics, ASTM F2170 moisture testing, and tailored technical proposals across all Malaysian industrial corridors.

RM
Transparent Pricing Policy

Usually starts from RM15,000 depending on project (need custom quote to be fair based on site slab condition & scope).

Chat with Technical Admin Now

Sebarang pertanyaan boleh diajukan terus kepada admin teknikal kami. Tuan/Puan dialu-alukan berkongsi pelan lantai atau jadual kerja tapak untuk nasihat segera.